“阿兔阿喵”通过精心收集,向本站投稿了20篇工厂班组长英文自我评价,下面是小编整理后的工厂班组长英文自我评价,欢迎您阅读分享借鉴,希望对您有所帮助。
- 目录
篇1:班组长英文自我评价
This year, by learning the Party's line, principles and policies and the party's Third Plenum of the spirit, a deep understanding of the important thought of “Three Represents” and the spirit and the importance of seeking truth and adhere to service learning. According to the Bureau of Safety and production tasks, work area at the beginning of the year, and the class workers together with reality, understand the situation, clear objectives, implement the plan. Due diligence, consciously engaged in practice for the full completion of the production tasks and achieve the safe operation of the team throughout the year to make up their own obligations. Famous model worker Xu Hu said it well: society is a big machine, the needs of different parts, as an alternative hydropower repairman, like a screw, they should keep in this position for the operation to make a big machine contribution parts. Plain language, awe-inspiring. Co-op itself in second class, and for a group of long, in fact, the production line of soldiers. In the second class and all the staff work together in life, though impoverished environment, busy, but always maintain a sense of balance, always keep in mind that he is a lead soldiers. As the first security team responsible person, feel the heavy responsibility, how to ensure the whole network - the Internet's largest resource network secretarial classes safe operation, and orderly production is their duty, it is also a special soldier. Own knowledge necessary to understand the business will be, but also good management. Many years of work in practice himself touched a superficial rule: as long as a thorough grasp of superior spirit, eyes down, the heart of the class of workers, combined with the actual situation due to the system should be able to find out the work of thinking, then gradual order to drive overall. Co-op is a special class team, Omo wide bottom, big job uncertainty, randomness, to improve safety in production and the overall work of the team must be between the team and between operations, the operation value with the operator, each management and the hook substation value between the start and improve cohesion and cooperation relations between each other, so that the upper and lower line, Ningchengyigu strength, so that the team form an organic unity. With some thought, after the beginning of the end of the restructuring team, in consultation with the team technicians and several key observations made to strengthen management team scores, developed a value management responsible for the system block specific regulations, clear responsibilities, to implement separately unified assessment. In specific operations and focus on the following two aspects: First, try to create harmony without losing principle a good atmosphere, creating a harmonious and relaxed working environment; the second is to play a team member enthusiasm and sense of ownership, achieve a high degree of democratic management team. Perfect to team leader as the core management staff workers as the backbone of the management system, so that everything was tubes, everything was done, everyone accountability duties, give full play to the initiative and creativity of every worker, and strictly enforce the team a series of rules and regulations, in front of the system to achieve equality. Strengthen awareness of self-management team members, within certain limits, to maximize the extent of their own energy, the team based management system, a self-examination, self-control, self-evaluation, so that the whole class of workers to establish a strong sense of responsibility and mission. Thus, the management team a solid foundation, and all aspects of work there is a guarantee. From the full year, the effect is obvious.
Well team overall, by the joint efforts of all employees, and to give full play to the enthusiasm of the team each employee must have a good image of men are the class of their own as long intervals of both producers and is not famous manager, I always make it clear that only set an example, take the lead, class members can be trusted to hear Jin, Qi efforts. He clung to a purpose of its own, asking others to do things that he do first; ask others to complete the task, the completion of its own first, put the whole team in his own image, to take concrete actions to influence team members, and to drive them. Year period for the global security situation is grim, the turning point of the security situation, promptly organize personnel to carry out class “Returning illegal discussion” and “Safety is not assured inspection” activities, and class staff together to talk about feelings, find the root cause, a more profound analysis of the presence of team work safety aspects, combined with the actual team has developed effective preventive measures, and to be guaranteed through the appropriate system to make it stable development of the security situation throughout the year, the work carried out smoothly and orderly. This year, production tasks and various aspects of the work is really busy, since the beginning of the power system, Zhenhai decentralized substation, a technician team to help the Bureau of Zhenhai Operation Course formation and technical training, increasing the pressure on the team management, and fitness in the appropriate period of time in the team to face three 110kv substation put into the task, and concentrate all production in February. As a running team, within one month of receiving the commissioning of three substations task, which is unprecedented, large workload is beyond imagination. Three substations put into operation not isolated to pull and related 110kv, 10kv load appears cutover, with daily operations is a significant increase, sometimes one day five or six substations also need to work, this staff has been fully tight , there are a lot of preparatory work must be completed and put into production as planned. Faced with this situation, their own deeply significant pressure, as team technician vacancies, both to co-ordinate their own daily work, but also take on responsibilities technician, check the drawings participation Code votes, transport regulation formulation, check equipment Devices tab, ordered production designer and arrange on-site training. To this end, the backbone and the team decided to discuss several break the routine, the original set of monthly work plan each week and refined to ensure safe and smooth completion of daily production at the same time, according to the specific circumstances of each value decomposition to everyone, and dynamically adjusts the progress of work per day, during the day can not be completed, then continue the evening rush. So for the overall work of the team, to give up a lot of time to rest. Other team personnel is also the overall situation, dedication, as long as the team needs, availability, more proactive plead indeed commendable. As the saying goes: people can remove the mountain. These production preparatory work can not be done routinely in the short term, miraculously in a month's time to fully complete, in order to ensure the smooth operation of three substations in time to create a solid foundation.
As a primary substation operation team, all the work than to ensure safe operation. The organization of some 20 people, 1xxxx substation to himself, to hold this position and maintain stable development, feel the heavy responsibility, which requires the work themselves into a ring must be in place to the point, without leaving any water, for themselves and their class two technicians in-depth process of actual daily production in the understanding and knowledge of the work of the law at the same time, from the beginning of the operation team from the back gate to the daily operation and management to develop appropriate measures: First, the establishment and improve the operation of large mission plan and weekly work plan. Every Friday afternoon, according to the network transmission task group, the elaboration of the work plan, arrange power, a clear division of work proposed precautions, the risk of pre-control point, and submit timely communication when values long, circulated by value, so peoplepeople aware beforehand prepared. Second, the establishment of large-scale operations before special inspection system substation by the hook value before the operation is responsible for 3-5 days and discharge measures to verify the remaining defects and related substation current problems, all kinds of anti-error operation of the arrangement, the column a detailed list; check the relevant substation types of safety equipment, ground wire and spare parts (emphasis levels fuses) the configuration,; check substation AC and DC lighting facilities. Third, the large monitor or technician operating at least one person to the scene, responsible for a large stop transmission and other complex operations of the organization and the coordination and supervision and work to ensure that the operation is correct. Fourth, the establishment of large-scale overhaul after operating system summary, sum up the experience of each operation and found problems, and this overhaul, the test results and the like. Fifth, in improving the number of related management systems, based on the large supply gap this year, according to the actual situation, the team prepared a three track records, dynamic monitoring (1, each team runs substation equipment defects and weaknesses Tip Sheet; 2 each substation main transformer heavy load monitoring and outlet table; 3, the substation equipment to hot spots and load table), by implementing a series of measures this year to compare the work smoothly and to guarantee a stable team up security situation, it would be their own masturbation lead to harvest it.
Recall work over the past year, a slight obtained, which received the care and guidance of the organization can not do without, but also inseparable from the class comrades work together, through thick and thin results. I am convinced that a person's capacity is limited, the key is what kind of attitude towards the work they are engaged in their own positions, doing a love one, down to earth, firmly grasp their own letter“now,” study hard, and constantly improve and enrich themselves and start from their own in charge of the work, from the moment regarding the start, the attitude of masters, conscientiously improve their own work, which is he has been the pursuit of desire.
篇2:工厂英文自我评价
In the long-term work practice adhere to the “safety first, prevention first”, strictly enforce the safety rules and regulations, based on their own positions, take the initiative to play a subjective initiative at the same time, adhere to the standard criteria for strict requirements themselves,Amount to complete the production work tasks.
Style solid, hard work hard working. Can strictly according to the standardization request, the procedure, the system and the measure, carries out each work, when meets the difficulty, perseverance, takes the initiative to overcome the difficult question which faces to face each duty which the leadership delivers. In the early stage of the workshop merger, the working facilities of the newly established Lechang power supply workshop were not complete. The workshop network could not be used. In order to transmit the production information in time, the communication equipment was put into operation to ensure the smooth flow of production information. In 20xx, I carried out the first contact catenary repair, as a electric power for the contact network focused on the preparation of the work plan, from learning to application, from ignorant to gradually understand, all embodies the tenacious struggle of professionalism.
Consciously strengthen the theory and business learning, theory and practice for the workshop safety management services. In daily production and life of diamond business technology and adhere to the modern business culture and scientific knowledge, and constantly improve their theoretical level, business ability and quality of cultivation, and focus on the knowledge used in production safety practice, with the workshop leaders do a good job in production management, For the first-line production to contribute. In the early 20xx to combat snow and ice disaster work, take the initiative to grasp the front-line dynamic information on the scene of the fault repair situation, equipment dynamic situation in a timely manner to make statistics, summarize, reported materials for the leadership to understand the dynamics of the scene to provide first-hand information, Quickly convey the higher order, whether fault repair or normal equipment inspection, regardless of day and night, adhere to earnestly complete all the summary of statistical materials reported work.
Team management and construction work, work independently. Since the team to play the team building management work, to combine the safety management team, closely around the theme of security work, to be diligent in thinking, to explore, loyalty, dare to dare tube, dare to dare to listen to team Staff advice, subject to the workshop leadership arrangements, do the right to insist on doing a good job, there are gaps in the initiative to find reasons, adjust the working methods, so as to sum up experience and improve the quality of work. Lechang power supply plant tube equipment scattered, daily management team and complex work, bow net, hydropower all kinds of professional team has to distinguish between different types of work groups of relatively unified management, no doubt with considerable difficulty, need to pay more labor , Often without rest for this day and night to work.
篇3:工厂英文自我评价
Over the past year, I have been dedicated to work in a creative and loving way, and have achieved some achievements. However, there are also some problems and shortcomings, mainly in the following points:
1. Safety aspects
Safety management did not do bit, strength is not enough; safety training is not in place; check not in place. In many cases, due to the labor intensity of the staff is larger, more physical exertion, so the completion of the day's output, do the work of sorting the scene ignored the phenomenon, there are irregularities in the operation of the repeated repeated crushing accidents . Now want to come to these accidents, I have an inescapable responsibility. First: in the organization and management team in the process of daily safety training is not really so that every employee will always be safe production in mind; Second: in the security check did not do the whole process of tracking the entire inspection; Finally: in the event of an accident did not promptly Sum up lessons learned to avoid the recurrence of similar incidents. So that my staff suffered pain, so that the damage to the honor and interests of the workshop I am very self-blame. To this end, I decided to work in the future to strengthen the intensity of safety training and improve the form of training and strengthen the security team security responsibilities, so that each team staff are aware of the importance of safety in production, resulting in “everyone's attention to safety Production, everyone involved in production safety, ”a good atmosphere.
2. Quality control aspects
Quality is produced, rather than check out, that is to say about total quality management, in accordance with the objectives and requirements to seriously do a good job in every aspect, every process.At the same time quality inspection is very important, especially in the production process of quality inspection can effectively avoid the occurrence of quality accidents and quality problems, after the event for the prevention and control in advance, change from passive to active.Although the company from top to bottom are beginning to pay attention to quality, but in practice there are still many problems, especially between the team, for example, in the weaving process there are many areas to be improved. To solve these problems is not a team can do a good job, which requires a number of relevant team work together, I think in order to do a good job of quality, we must grasp the “strict, fine, real” principle, to strict management, Careful and meticulous, pay close attention to implementation.
3. Team management
Although the management level of the team has been improved in the past year, there are still some problems, such as: the standardized work situation of the staff to be improved, the technical level of the staff to be improved, the enthusiasm of the staff has not been fully mobilized Wait.No high-level management, there is no high-quality staff, there is no high-quality products. Therefore, I will focus on the future work to improve the overall quality of the team and staff issues, make full use of spare time, and more arrangements for some of the knowledge of the standardization of training, strive for a shorter period of time so that the overall quality of staff has a larger Promotion.
篇4:工厂英文自我评价
Since the beginning of my career, I have been constantly strengthening my self-cultivation, striving to improve the ideological and moral level, earnestly carry out the deepening of the cultural and professional knowledge, continue to explore new knowledge, forge ahead, and actively carry out intelligent range The work, the complete performance of a electrician's work responsibilities, from a good example to take the lead role. And actively participate in technological exchanges and technological innovation activities, the earth to do a good job, help, with the role, and fully completed the tasks assigned to the higher levels and targets in the company's production and development play its due role.Now I have been working since the professional and technical work are summarized as follows:
First, consciously strengthen theoretical study, and strive to improve personal qualities
Without a firm and true political orientation, there will be no positive guiding ideology. In order to continuously improve their political and ideological quality, the past few years I have been very concerned about national affairs, concerned about the situation at home and abroad, combined with the impact of changes in the situation of enterprises to analyze and put this idea into practical action to the production process to ensure In their thinking and action has always been consistent with the party and enterprise. At the same time, this idea into the work and study, the constant pursuit of their own progress. In order to be successful, a person's career must first learn how to behave! Especially in our highly technical work, to see things carefully, do things to concentrate on, to learn to be modest. Can not have the slightest sloppy and error. All the first work attitude to correct, have a good professional quality, work to be serious and responsible, subject to leadership arrangements, open to others to listen to advice and advice, to unite colleagues, courtesy, warm service.
Second, correct work attitude, play a leading role
I fully understand the importance of mechanical and electrical management during the construction period. In particular, it contains most of the invisible electrical infrastructure and engineering. It is necessary to supervise and inspect the problems at any time. We must solve the problems and never hastily. Otherwise, Eradication, which we place mechanical and electrical management in front of a test and responsibility. As an electrician, the responsibility and the burden of my duty. Therefore, in the usual work, I made myself some of the strict requirements: one in the face of dirty tired and bitter at work to grab the front of the workers dry, and more than the workers do the next; In the face of technical problems is to come forward and do their best to overcome technical difficulties; I always adhere to do my best to do everything to the interests of the company. Third, I asked myself to be responsible; I think that since he is an electrician, then the level of business and many other aspects of the general workers should be stronger than some. In the company assigned tasks, the general workers to complete the more difficult tasks, they should take the initiative to take on more, but not with the workers buck-passing, to make the teacher who demeanor, Yong burden. I usually not only ask their own, in practice, I also do according to these requirements.
Third, strengthen business learning, improve the technical level
Science and technology continue to develop today, one day do not learn to be backward. In particular, this piece of electrical automation, no one hundred percent of all proficient in finished, so I usually have time to look at professional books. Over the past year, I have collected a large number of new professional books, constantly enrich themselves, continue to grasp the new knowledge. Such as “electrical design drawing”, “electronic technology”, “modern frequency technology”, “DC in industrial applications” and so on, in the process of learning this knowledge, I learned a lot of new knowledge, such as: PLC programming control Principle, ABB inverter settings and control principles, SIPMOS high-power two-way SCR control principle, and so I really benefit! Not only broadened my knowledge, is still largely improved my technical level, But also I have a higher level of theoretical and technical knowledge of the study had a keen interest.
Fourth, the development of skills to each other to achieve social services
In the usual work, I often carry out technical discussions and exchanges with other workers, to share their knowledge and share with others, and learn from others who do not understand their knowledge and achieve common progress. I am fully integrated theory and practice, continue to accumulate experience, continue to study new business, which makes my skill level to a skilled, use the ease of the point.
To sum up, I feel worthy of the honorable title of electrician! But I, as a technical staff, can not be narcissistic now, but still continue to strengthen their own learning, continue to learn from each other, and only then can keep up with The pace of the times steady progress, but also be able to better serve the enterprises and serve the community.
篇5:工厂英文自我评价
In the long-term work practice adhere to the “safety first, prevention first”, strictly enforce the safety rules and regulations, based on their own positions, take the initiative to play a subjective initiative at the same time, adhere to the standard criteria for strict requirements themselves,Amount to complete the production work tasks.
Style solid, hard work hard working. Can strictly according to the standardization request, the procedure, the system and the measure, carries out each work, when meets the difficulty, perseverance, takes the initiative to overcome the difficult question which faces to face each duty which the leadership delivers. In the early stage of the workshop merger, the working facilities of the newly established Lechang power supply workshop were not complete. The workshop network could not be used. In order to transmit the production information in time, the communication equipment was put into operation to ensure the smooth flow of production information. In 2008, I carried out the first contact catenary repair, as a electric power for the contact network focused on the preparation of the work plan, from learning to application, from ignorant to gradually understand, all embodies the tenacious struggle of professionalism.
Consciously strengthen the theory and business learning, theory and practice for the workshop safety management services. In daily production and life of diamond business technology and adhere to the modern business culture and scientific knowledge, and constantly improve their theoretical level, business ability and quality of cultivation, and focus on the knowledge used in production safety practice, with the workshop leaders do a good job in production management, For the first-line production to contribute. In the early 2008 to combat snow and ice disaster work, take the initiative to grasp the front-line dynamic information on the scene of the fault repair situation, equipment dynamic situation in a timely manner to make statistics, summarize, reported materials for the leadership to understand the dynamics of the scene to provide first-hand information, Quickly convey the higher order, whether fault repair or normal equipment inspection, regardless of day and night, adhere to earnestly complete all the summary of statistical materials reported work.
Team management and construction work, work independently. Since the team to play the team building management work, to combine the safety management team, closely around the theme of security work, to be diligent in thinking, to explore, loyalty, dare to dare tube, dare to dare to listen to team Staff advice, subject to the workshop leadership arrangements, do the right to insist on doing a good job, there are gaps in the initiative to find reasons, adjust the working methods, so as to sum up experience and improve the quality of work. Lechang power supply plant tube equipment scattered, daily management team and complex work, bow net, hydropower all kinds of professional team has to distinguish between different types of work groups of relatively unified management, no doubt with considerable difficulty, need to pay more labor , Often without rest for this day and night to work.
篇6:班组长管理英文自我评价
Suddenly, he had a busy quarter of. I really feel in the last work in the workshop leader and team staff support and support themselves matured. All the training workshop organized activities, I question their own shortcomings and have a deeper understanding of the team management's awareness has been further improved. Here, I combine my own state of mind, the actual work of self-criticism:
In terms of ideology, active, motivated.
As a team leader, I was in production, adhere to quality, safety supervision, careful observation of the idea of dynamic team of employees, pay attention to the method of communication with employees, and employees do their utmost to stand together, learn together, work together to complete the team focus on training for employees of all abilities, at work, I know the importance of learning, and to seize every opportunity to seriously study the best squad in continuous learning and practice, and continuously improve their management and communication skills.
At work, love and dedication, self-discipline.
At work, self-discipline and strict right to use, according to the size of a man. Adhere to the implementation of various systems, from time to time for the sake of employees, according to the rules of the company and the workshop with power; a man seeking truth from facts, on various issues raised by team staff never shied away from, the team also won the honor, thus creating a dynamic, motivated collectiveteam.
Self problems:
1, the theoretical water policy assessment is not high enough, not enough learning theory, management level is not high.
2, the first mode of consciousness is not strong. Strict with themselves, the standard is not high, but only so-so, not for the hard life, words and deeds can not be advanced to influence and lead the staff. Lack of awareness of the work of excellence in competition and fighting spirit of innovation, learning and studying theoretical knowledge and expertise without a certain height.
3, lack of innovation, lack of bright spots.
4, open-minded enough, failing to easily irritable, lack of control
Fourth, the corrective measures:
1, to strengthen the theory of learning, and constantly improve their political quality. Consciously strengthen the training, the concept of self-discipline to arm themselves, to those dedicated, positive, innovative colleagues study, work and more brains.
2, a man to be real high sense of responsibility, dedication, hard work, solid, despite the difficulties of courage to complete various tasks in the process of development of regional management manipulation workshop team to a higher level.
3, establish a team spirit. As a team leader, I have to keep a clear head, followed by the times, give full play to the initiative. To consciously strengthen the training, to learn and observe good at summing up at work, raise awareness of innovation
4, I work and new intern labor care enough. In the future study, work and more concerned about them than usual chat for thought trends.
In short, as a team leader in the work to play an exemplary role, should be based on their own work, and strive to do our own work, dedication, fine drilling business. Study and work in the future, I will continue to reflect on, continue to advance in the reflection. Humbly accept my colleagues around me suggestions and comments, and strive to improve themselves, to make their own progress, play a leading and exemplary role for the team good service, a squad leader bounden duty to do, and strive to do a good team leader.
篇7:班组长管理英文自我评价
In the past year, as a Communist party member, deeply felt concern and educational organizations, but also feel that they shoulder the head of the party's sustenance and responsibility. This year, by learning the Party's line, principles and policies and the party's Third Plenum of the spirit, a deep understanding of the important thought of “Three Represents” and the spirit and the importance of seeking truth and adhere to service learning. According to the Bureau of Safety and production tasks, work area at the beginning of the year, and the class workers together with reality, understand the situation, clear objectives, implement the plan. Due diligence, consciously engaged in practice for the full completion of the production tasks and achieve the safe operation of the team throughout the year to make up their own obligations. Famous model worker Xu Hu said it well: society is a big machine, the needs of different parts, as an alternative hydropower repairman, like a screw, they should keep in this position for the operation to make a big machine contribution parts. Plain language, awe-inspiring. Co-op itself in second class, and for a group of long, in fact, the production line of soldiers. In the second class and all the staff work together in life, though impoverished environment, busy, but always maintain a sense of balance, always keep in mind that he is a lead soldiers. As the first security team responsible person, feel the heavy responsibility, how to ensure the whole network - the Internet's largest resource network secretarial classes safe operation, and orderly production is their duty, it is also a special soldier. Own knowledge necessary to understand the business will be, but also good management. Many years of work in practice himself touched a superficial rule: as long as a thorough grasp of superior spirit, eyes down, the heart of the class of workers, combined with the actual situation due to the system should be able to find out the work of thinking, then gradual order to drive overall. Co-op is a special class team, Omo wide bottom, big job uncertainty, randomness, to improve safety in production and the overall work of the team must be between the team and between operations, the operation value with the operator, each management and the hook substation value between the start and improve cohesion and cooperation relations between each other, so that the upper and lower line, Ningchengyigu strength, so that the team form an organic unity. With some thought, after the beginning of the end of the restructuring team, in consultation with the team technicians and several key observations made to strengthen management team scores, developed a value management responsible for the system block specific regulations, clear responsibilities, to implement separately unified assessment. In specific operations and focus on the following two aspects: First, try to create harmony without losing principle a good atmosphere, creating a harmonious and relaxed working environment; the second is to play a team member enthusiasm and sense of ownership, achieve a high degree of democratic management team. Perfect to team leader as the core management staff workers as the backbone of the management system, so that everything was tubes, everything was done, everyone accountability duties, give full play to the initiative and creativity of every worker, and strictly enforce the team a series of rules and regulations, in front of the system to achieve equality. Strengthen awareness of self-management team members, within certain limits, to maximize the extent of their own energy, the team based management system, a self-examination, self-control, self-evaluation, so that the whole class of workers to establish a strong sense of responsibility and mission. Thus, the management team a solid foundation, and all aspects of work there is a guarantee. From the full year, the effect is obvious.
Well team overall, by the joint efforts of all employees, and to give full play to the enthusiasm of the team each employee must have a good image of men are the class of their own as long intervals of both producers and is not famous manager, I always make it clear that only set an example, take the lead, class members can be trusted to hear Jin, Qi efforts. He clung to a purpose of its own, asking others to do things that he do first; ask others to complete the task, the completion of its own first, put the whole team in his own image, to take concrete actions to influence team members, and to drive them. Year period for the global security situation is grim, the turning point of the security situation, promptly organize personnel to carry out class “Returning illegal discussion” and “Safety is not assured inspection” activities, and class staff together to talk about feelings, find the root cause, a more profound analysis of the presence of team work safety aspects, combined with the actual team has developed effective preventive measures, and to be guaranteed through the appropriate system to make it stable development of the security situation throughout the year, the work carried out smoothly and orderly. This year, production tasks and various aspects of the work is really busy, since the beginning of the power system, Zhenhai decentralized substation, a technician team to help the Bureau of Zhenhai Operation Course formation and technical training, increasing the pressure on the team management, and fitness in the appropriate period of time in the team to face three 110kv substation put into the task, and concentrate all production in February. As a running team, within one month of receiving the commissioning of three substations task, which is unprecedented, large workload is beyond imagination. Three substations put into operation not isolated to pull and related 110kv, 10kv load appears cutover, with daily operations is a significant increase, sometimes one day five or six substations also need to work, this staff has been fully tight , there are a lot of preparatory work must be completed and put into production as planned. Faced with this situation, their own deeply significant pressure, as team technician vacancies, both to co-ordinate their own daily work, but also take on responsibilities technician, check the drawings participation Code votes, transport regulation formulation, check equipment Devices tab, ordered production designer and arrange on-site training. To this end, the backbone and the team decided to discuss several break the routine, the original set of monthly work plan each week and refined to ensure safe and smooth completion of daily production at the same time, according to the specific circumstances of each value decomposition to everyone, and dynamically adjusts the progress of work per day, during the day can not be completed, then continue the evening rush. So for the overall work of the team, to give up a lot of time to rest. Other team personnel is also the overall situation, dedication, as long as the team needs, availability, more proactive plead indeed commendable. As the saying goes: people can remove the mountain. These production preparatory work can not be done routinely in the short term, miraculously in a month's time to fully complete, in order to ensure the smooth operation of three substations in time to create a solid foundation.
As a primary substation operation team, all the work than to ensure safe operation. The organization of some 20 people, 1xxxx substation to himself, to hold this position and maintain stable development, feel the heavy responsibility, which requires the work themselves into a ring must be in place to the point, without leaving any water, for themselves and their class two technicians in-depth process of actual daily production in the understanding and knowledge of the work of the law at the same time, from the beginning of the operation team from the back gate to the daily operation and management to develop appropriate measures: First, the establishment and improve the operation of large mission plan and weekly work plan. Every Friday afternoon, according to the network transmission task group, the elaboration of the work plan, arrange power, a clear division of work proposed precautions, the risk of pre-control point, and submit timely communication when values long, circulated by value, so peoplepeople aware beforehand prepared. Second, the establishment of large-scale operations before special inspection system substation by the hook value before the operation is responsible for 3-5 days and discharge measures to verify the remaining defects and related substation current problems, all kinds of anti-error operation of the arrangement, the column a detailed list; check the relevant substation types of safety equipment, ground wire and spare parts (emphasis levels fuses) the configuration,; check substation AC and DC lighting facilities. Third, the large monitor or technician operating at least one person to the scene, responsible for a large stop transmission and other complex operations of the organization and the coordination and supervision and work to ensure that the operation is correct. Fourth, the establishment of large-scale overhaul after operating system summary, sum up the experience of each operation and found problems, and this overhaul, the test results and the like. Fifth, in improving the number of related management systems, based on the large supply gap this year, according to the actual situation, the team prepared a three track records, dynamic monitoring (1, each team runs substation equipment defects and weaknesses Tip Sheet; 2 each substation main transformer heavy load monitoring and outlet table; 3, the substation equipment to hot spots and load table), by implementing a series of measures this year to compare the work smoothly and to guarantee a stable team up security situation, it would be their own masturbation lead to harvest it.
Recall work over the past year, a slight obtained, which received the care and guidance of the organization can not do without, but also inseparable from the class comrades work together, through thick and thin results. I am convinced that a person's capacity is limited, the key is what kind of attitude towards the work they are engaged in their own positions, doing a love one, down to earth, firmly grasp their own letter“now,” study hard, and constantly improve and enrich themselves and start from their own in charge of the work, from the moment regarding the start, the attitude of masters, conscientiously improve their own work, which is he has been the pursuit of desire.
篇8:班组长管理英文自我评价
The new year, we earnestly implement the specific requirements of five lines, combined with the actual center, specifically to carry out the following work “lean production management, 5s on-site management activities, safe and clean production, conduct activities, team management activities” to strengthen the training of team members,increase awareness. Take the lead in learning and the acquisition of knowledge about the team culture. Through study and training, so that the team clearly carried the team culture function, clear the Significance team culture, defined by guiding the team culture, incentives and constraints effect, to enhance the team staff cohesion and solidarity, so that the enthusiasm of the masses of workers and creativity to give maximize, to promote the integration and implementation team and business goals. Team overhaul I use spare time to organize team conducted a study, and were asked to learn after the great debate, and write on the “lean production management” understanding, from staff to discuss the results point of view, in terms of “lean production management ”understanding, or from their own ideology, they have been greatly improved, especially to make them feel tract, lean production, the primary consciousness, with the consciousness of innovation and improvement to be able to drive their lean production find ways to improve the course of the activity, and thus to achieve the target improvement.
Measures to develop the system, team building summary, on the basis of investigation and study on the proposed team building ideas, and then to corporate team building team from the Safety Culture Construction to the corporate team-building, we focus on “excellence, the pursuit of excellence” spirit, proposed a “study hard, beyond the self,” the learning concept, “concerned about security, love life”, “life first, safe for the day,” the security concept, “excellence, Yong-class struggle” the quality of ideas, a clear “zero accidents, dangerous and unpredictable full participation ”of the security principle, to further enhance the quality of the workforce, standardize basic management team, corporate culture so firmly founded on team culture.
In the future we want to pay close attention to team work in conjunction, find support team building. Summary of the work team building team-building activities must be attached to the cultural daily work. We first find the right way, from four aspects, the ideological and cultural team building and spiritual civilization, maintain employee education campaign and the ideological and political work, theoretical study and work combine to continuously enrich and deepen; the construction of safety culture and safety evaluation of the implementation of the combination, the establishment of large security mechanisms; continuously improve the theoretical knowledge of the workers and professional and technical level; Lean production system cultural construction with the company for a combination of the control standards, find deficiencies and improve my team membersexecution, team building norms.
篇9:工厂计量英文自我评价
Under the leadership of the teacher we lined up into the Shaanxi flames limited liability company's production workshop, after the relevant person in charge of the distribution I and the other four students were assigned to the bakelite workshop.
Into the workshop, the master of the workers on the performance of our very happy, enthusiastic greeting me, as far as possible to me to introduce me to do the work, I just came in a sense of tension swept away. In the workers under the master's explanation we understand the next week's work content. And found that we seem to be doing a great cause, because we processed the antenna is to be installed in the tank above. And many of these antennas are sold abroad. The thought of their use of the antenna in some of their own to do, and my heart can not say proud.
The antenna body has four sections, connected to one from the low to high diameter in turn, from the bottom to the top in turn; a connecting base, 2 with a fixed rope, fixed rope and a metal, is used to connect the antenna , The main package a total of 7 positions, 7 accessories can be loaded into, and then a line of the rope, the antenna package folded up.easy to carry.
Our work that trouble to not trouble, but need to have enough patience.The first is to use a small blade to a white plastic end of a dust removal.Because the blade is very hand the school is very difficult to take, a long time, the hand will be blisters, even though we have to clean up, or inevitable, but the thought of these workers uncle for decades to do the job, admiration Feeling arises spontaneously. They are for the motherland of tomorrow, not afraid of suffering, then we have nothing to fear.
The second task is to remove the antenna under the core, there is the fiberglass shell to the gelatinization treatment, it seems simple, it is not true, because the plastic outside the plastic film is very hard, accidentally cut Finger, the master of the workers in the explanation, we found a small hand does not cut the hand tips. The third task is the casing, in order to prevent the antenna interference, will use the plastic tube to isolate the antenna.
The fourth work has a good name to listen to this is a high-tech live, in a one-meter-long plastic tube wearing a thin copper wire is only 0.3 mm.Really is not an easy thing, even more depressing is that sometimes when you wear to the end of the moment, just so bad 2 cm, just can not pass, and my heart that hate Egypt do not know who invented the antenna practice, although complaining There are still, but we still learn to make fun of, we five people started the game, to see who wear the fast and. In this way the work was also very easy to solve. We summed up the truth - do not just have the patience to do this, there is another condition, that is luck, good luck, smooth. Bad luck, then move.
The fifth task is welding, this welding is different from the radio welding, it is the soldering iron fixed, mobile components to complete the welding. As the temperature is high, it requires us to fast, accurate, and requires a beautiful weldment.
The sixth task is to insulate small transformers with insulating varnishes.This work is the most easy to complete. Is the best learning.
The seventh job is the mat, although good to do, but need a little effort.Because there are many components will not affect the role of the antenna, so even if the production is not very qualified, in order not to waste, will continue to use. This requires a little more effort.
The eighth task is to tie the line, it sounds very easy to do it is not simple. The reason is not only to tie, but also tied labor, so as not to tamper with the antenna in the glass tank. Worker master taught us to tie the method, the beginning of the tie is very awkward, tied the number of more, even find work is the door to fun.
Week internship is the deepest feelings of some of the Fiberhome Group of dedicated workers. Here the workers are very amiable and friendly people, often some humorous words to our work to add fun. The most touching is that when we can not personally participate in the Olympic torch relay, they play radio for us so that we hear the whole process of tracking the torch relay.
The rapid development of modern science and technology era, the types of high-tech products more and more, production technology and production processes are also different. But no matter what kind of products, from raw materials to produce products are processed to follow certain production principles, through a number of major equipment and process to complete. And never try to use machines instead of manual, no matter how fast the machine can not replace human labor. And this is not only labor, or passion to pass.
篇10:工厂英文自我评价怎么写
I work, has been engaged in a line of electrical work, over the years, I have strict demands on themselves, work conscientiously. Mainly from the following aspects to sum up:
First, the ideological and political learning and democratic management
I earnestly studied Marxism-Leninism, Mao Zedong Thought and Deng Xiaoping Theory, and guided the production practice in the spirit of the three represents.
Actively participate in all kinds of democratic activities, participate in democratic management, work hard at home, work well, and do a good job as a production frontline electrician.
Second, the safety aspects
1, implement the spirit of the higher documents to improve the safety awareness of workers, enhance the sense of responsibility of workers.
2, to implement and improve the safe use of electricity organizational system, improve safety management rules and regulations.
3, to strengthen safety management team to consolidate the security base.
4, one to ensure that electricity consumers to ensure their own safety and security of others.
Third, training and learning
Over the years, I actively participate in various learning and training, and strive to learn the basic knowledge of electrician knowledge, power supply system knowledge, line devices, lighting devices, grounding devices, transformer operation and maintenance, motor repair and maintenance, electrical control circuit, PLC Control and other related knowledge system. Every time I learn, I have learned some new theories, and used to guide the work practice, applied to the work, to the factory power supply system, the control system improvement, receives the consistent high praise.
Fourth, in terms of energy saving
In energy saving, I actively use the knowledge has been learned for the factory to do a lot of energy saving aspects of the contribution. Such as the transformation of the factory line, the annual energy saving for the factory more than ten million degrees. While the old factory equipment, electrical transformation, so that some of the old equipment to rejuvenate.
Fifth, the practice of production
In the production practice, for example: motor electrical fault detection and troubleshooting examples. Electrical: 1, check the lead wire insulation is intact, the motor is overheated, check whether the wiring meets the nameplate requirements, winding and the first, the end of power is correct; 2, measuring insulation resistance and DC resistance test insulation is damaged. 3, power on the check after the end of the problem found, you can directly power test with a three-phase voltage regulator began to impose a lower voltage, and then gradually increased to the rated voltage, etc .. 3, power-on check whether there is no open circuit, short circuit and grounding; . Use the above inspection method, for the factory more than one motor to find fault, and fix it. Timely summary of various symptoms and solutions, and documented, to guide the practice, but also improve their business level. In short, the production practice in the rules and regulations on the wall, in strict accordance with the rules and regulations. Over the years, the factory did not occur with a life-related electrical safety problems, and the factory through a number of technical transformation, equipment operation more scientific and rationalized.
篇11:工厂自我评价
Time flies, years have been quietly away from us, looking back over the past year, the heart can not help but be filled with emotion. Over the past year, the company leadership and colleagues in the support and help, I am strict demands on themselves, in accordance with the requirements of the company and the workshop, to better complete their own work, and through efforts to make their own work in the new modelOf the breakthrough, the work has been greatly improved. The work in 20xx is summarized as follows:
First, the main work done
1. Workshop construction and management have been strengthened
Because I did not work for a long time, because of the chaotic management of the workshop, so in the workshop there are many problems to be solved. In order to solve these problems, I propose to take measures to regulate the implementation of positive incentive system in 20xx. For the better performance of the team to give employees plus assessment points, and for the poor performance of the staff are determined to deduct a certain assessment points. Take this rewards and punishments, fair and impartial assessment methods, I believe that the implementation of team staff will be greatly improved and will improve the team cohesion.
2. Pay close attention to safety management
After finishing the relative to the company's other workshops for more security risks, more prone to accidents, in the past 20xx, there have been several work-related accidents, these accidents have been to the company and the workshop losses. “Fool with blood for the lesson, the wise use of lessons to avoid accidents”, although the power is not great, but shoulders the whole class of more than a dozen employees of the important task of life safety. Therefore, for security work I have never relaxed, Yueyue Jiang, every day.
3. To ensure product quality
With the expansion of the company's size and visibility of the increasing customer Xinhui the quality requirements are also getting higher and higher, so the company's high-level attention to product quality has also been referred to an unprecedented level. Xinhui as a whole the last pass, after finishing the responsibility to shoulder more and more. I know that as a workshop monitor, their work directly affect the quality of the work of the workshop. For the company's responsibility, I have been in quality control has been lax, and colleagues in a timely manner and timely communication and exchange of information, for the production process problems, defects never easily let go. At the same time to strengthen the importance of the quality of staff awareness, require everyone to do a good job self-inspection and mutual inspection work to ensure that a problem from the class into the market.
4. Actively participate in shop improvement activities
After finishing the workshop is like a big family, I live and work in this warm family every day, as a member of this family I think I have the obligation and responsibility to build her better harmony. Therefore, over the past year, I plot and workshop improvement activities, and mobilize the enthusiasm of team members, the use of collective wisdom of the workshop made a lot of valuable improvements.
5. Strengthen their own learning, improve the business level
Because of the heavy burden of their own body, and their knowledge, ability and experience with a good competent monitor have a certain distance, so the total can not be taken lightly, has been learning, learning to the books, learning to the surrounding leaders, To learn from colleagues, and actively improve the quality of their business, and strive to improve work efficiency and quality of work, for work initiative.Through this year's efforts to feel that they still have some progress, be able to calmly deal with the daily work of the various problems, in the organization and management capacity, comprehensive analysis, coordination and writing skills and verbal ability, etc. A great improvement to ensure that the work of the normal operation of the post, to the right attitude towards the various tasks, with a strong professionalism, sense of responsibility.
篇12:工厂自我评价
In the long-term work practice adhere to the “safety first, prevention first”, strictly enforce the safety rules and regulations, based on their own positions, take the initiative to play a subjective initiative at the same time, adhere to the standard criteria for strict requirements themselves,Amount to complete the production work tasks.
Style solid, hard work hard working. Can strictly according to the standardization request, the procedure, the system and the measure, carries out each work, when meets the difficulty, perseverance, takes the initiative to overcome the difficult question which faces to face each duty which the leadership delivers. In the early stage of the workshop merger, the working facilities of the newly established Lechang power supply workshop were not complete. The workshop network could not be used. In order to transmit the production information in time, the communication equipment was put into operation to ensure the smooth flow of production information. In 20__, I carried out the first contact catenary repair, as a electric power for the contact network focused on the preparation of the work plan, from learning to application, from ignorant to gradually understand, all embodies the tenacious struggle of professionalism.
Consciously strengthen the theory and business learning, theory and practice for the workshop safety management services. In daily production and life of diamond business technology and adhere to the modern business culture and scientific knowledge, and constantly improve their theoretical level, business ability and quality of cultivation, and focus on the knowledge used in production safety practice, with the workshop leaders do a good job in production management, For the first-line production to contribute. In the early 20__ to combat snow and ice disaster work, take the initiative to grasp the front-line dynamic information on the scene of the fault repair situation, equipment dynamic situation in a timely manner to make statistics, summarize, reported materials for the leadership to understand the dynamics of the scene to provide first-hand information, Quickly convey the higher order, whether fault repair or normal equipment inspection, regardless of day and night, adhere to earnestly complete all the summary of statistical materials reported work.
Team management and construction work, work independently. Since the team to play the team building management work, to combine the safety management team, closely around the theme of security work, to be diligent in thinking, to explore, loyalty, dare to dare tube, dare to dare to listen to team Staff advice, subject to the workshop leadership arrangements, do the right to insist on doing a good job, there are gaps in the initiative to find reasons, adjust the working methods, so as to sum up experience and improve the quality of work. Lechang power supply plant tube equipment scattered, daily management team and complex work, bow net, hydropower all kinds of professional team has to distinguish between different types of work groups of relatively unified management, no doubt with considerable difficulty, need to pay more labor , Often without rest for this day and night to work.
篇13:工厂优秀班长英文自我评价
Over the past year, I have been dedicated to work in a creative and loving way, and have achieved some achievements. However, there are also some problems and shortcomings, mainly in the following points:
1. Safety aspects
Safety management did not do bit, strength is not enough; safety training is not in place; check not in place. In many cases, due to the labor intensity of the staff is larger, more physical exertion, so the completion of the day's output, do the work of sorting the scene ignored the phenomenon, there are irregularities in the operation of the repeated repeated crushing accidents . Now want to come to these accidents, I have an inescapable responsibility. First: in the organization and management team in the process of daily safety training is not really so that every employee will always be safe production in mind; Second: in the security check did not do the whole process of tracking the entire inspection; Finally: in the event of an accident did not promptly Sum up lessons learned to avoid the recurrence of similar incidents. So that my staff suffered pain, so that the damage to the honor and interests of the workshop I am very self-blame. To this end, I decided to work in the future to strengthen the intensity of safety training and improve the form of training and strengthen the security team security responsibilities, so that each team staff are aware of the importance of safety in production, resulting in “everyone's attention to safety Production, everyone involved in production safety, ”a good atmosphere.
2. Quality control aspects
Quality is produced, rather than check out, that is to say about total quality management, in accordance with the objectives and requirements to seriously do a good job in every aspect, every process.At the same time quality inspection is very important, especially in the production process of quality inspection can effectively avoid the occurrence of quality accidents and quality problems, after the event for the prevention and control in advance, change from passive to active.Although the company from top to bottom are beginning to pay attention to quality, but in practice there are still many problems, especially between the team, for example, in the weaving process there are many areas to be improved. To solve these problems is not a team can do a good job, which requires a number of relevant team work together, I think in order to do a good job of quality, we must grasp the “strict, fine, real” principle, to strict management, Careful and meticulous, pay close attention to implementation.
3. Team management
Although the management level of the team has been improved in the past year, there are still some problems, such as: the standardized work situation of the staff to be improved, the technical level of the staff to be improved, the enthusiasm of the staff has not been fully mobilized Wait.No high-level management, there is no high-quality staff, there is no high-quality products. Therefore, I will focus on the future work to improve the overall quality of the team and staff issues, make full use of spare time, and more arrangements for some of the knowledge of the standardization of training, strive for a shorter period of time so that the overall quality of staff has a larger Promotion.
Future efforts
The new year represents a new beginning, new opportunities and new challenges. I will redouble their efforts to seriously improve the business, the level of work for the company and workshop development, contribute their own strength.
I am determined to do the following in the following year:
1. Strengthen learning, broaden the knowledge. Strive to study stamping expertise and related management knowledge;
2. In the principle of seeking truth from facts, so the situation issued, the next situation reported; really good leadership of the assistant;
3. Strengthen communication and cooperation with the workshop brothers and team, to the advanced team to learn, strengthen management, and strive to make the team to form a solid, hard work and good atmosphere;
4. Fully completed the workshop to the various tasks for the workshop to bring out a tough fight, hard-working team.
Finally, I hope the company leadership in the future work, as always, support me, I will be more outstanding performance of the company's return on the leadership of care and love, because I will always work!Thank you!
篇14:工厂优秀班长英文自我评价
Time flies, xxxx years have been quietly away from us, looking back over the past year, the heart can not help but be filled with emotion. Over the past year, the company leadership and colleagues in the support and help, I am strict demands on themselves, in accordance with the requirements of the company and the workshop, to better complete their own work, and through efforts to make their own work in the new modelOf the breakthrough, the work has been greatly improved. The work in 20xx is summarized as follows:
First, the main work done
1. Workshop construction and management have been strengthened
Because I did not work for a long time, because of the chaotic management of the workshop, so in the workshop there are many problems to be solved. In order to solve these problems, I propose to take measures to regulate the implementation of positive incentive system in 20xx. For the better performance of the team to give employees plus assessment points, and for the poor performance of the staff are determined to deduct a certain assessment points. Take this rewards and punishments, fair and impartial assessment methods, I believe that the implementation of team staff will be greatly improved and will improve the team cohesion.
2. Pay close attention to safety management
After finishing the relative to the company's other workshops for more security risks, more prone to accidents, in the past 20xx, there have been several work-related accidents, these accidents have been to the company and the workshop losses. “Fool with blood for the lesson, the wise use of lessons to avoid accidents”, although the power is not great, but shoulders the whole class of more than a dozen employees of the important task of life safety. Therefore, for security work I have never relaxed, Yueyue Jiang, every day.
3. To ensure product quality
With the expansion of the company's size and visibility of the increasing customer Xinhui the quality requirements are also getting higher and higher, so the company's high-level attention to product quality has also been referred to an unprecedented level. Xinhui as a whole the last pass, after finishing the responsibility to shoulder more and more. I know that as a workshop monitor, their work directly affect the quality of the work of the workshop. For the company's responsibility, I have been in quality control has been lax, and colleagues in a timely manner and timely communication and exchange of information, for the production process problems, defects never easily let go. At the same time to strengthen the importance of the quality of staff awareness, require everyone to do a good job self-inspection and mutual inspection work to ensure that a problem from the class into the market.
4. Actively participate in shop improvement activities
After finishing the workshop is like a big family, I live and work in this warm family every day, as a member of this family I think I have the obligation and responsibility to build her better harmony. Therefore, over the past year, I plot and workshop improvement activities, and mobilize the enthusiasm of team members, the use of collective wisdom of the workshop made a lot of valuable improvements.
5. Strengthen their own learning, improve the business level
Because of the heavy burden of their own body, and their knowledge, ability and experience with a good competent monitor have a certain distance, so the total can not be taken lightly, has been learning, learning to the books, learning to the surrounding leaders, To learn from colleagues, and actively improve the quality of their business, and strive to improve work efficiency and quality of work, for work initiative.Through this year's efforts to feel that they still have some progress, be able to calmly deal with the daily work of the various problems, in the organization and management capacity, comprehensive analysis, coordination and writing skills and verbal ability, etc. A great improvement to ensure that the work of the normal operation of the post, to the right attitude towards the various tasks, with a strong professionalism, sense of responsibility.
篇15:工厂优秀班长英文自我评价
Blink of an eye, busy in a quarter. I really feel in the past work, leadership and team in the workshop staff support and support, their gradually mature. Through the workshop organization of various training and activities, I have their own problems and deficiencies have a deeper understanding of the team management awareness has also been further improved. Here, I combine their own ideological situation, the actual work of self-criticism:
In the ideological, positive, positive motivated.
As a team leader, I am in the production, adhere to the quality, safety supervision, careful observation of the team members of the ideological trends, pay attention to communication methods and staff to make the greatest efforts and staff stand together to learn and work together to complete the team , Pay attention to the training of staff ability, at work, I know the importance of learning, seize every opportunity to earnestly study the excellent monitor, in continuous learning and practice constantly improve their management level and communication skills.
At work, dedication and love, self-discipline.
In work, strict self-discipline, strict to use, according to the size of life.Adhere to the implementation of various systems, from time to time for the sake of employees, according to the rules of the company and the power to move the shop; a realistic man, the team raised a variety of staff questions never avoid, team also received the honor, team.
Self-existing problems:
1, policy theory Water evaluation is not high enough, the theory of learning is not enough, the management level is not high.
2, the first mode of consciousness is not strong. On their own lax, the standard is not high, just flies, not flies hard, can not use advanced words and deeds affect and drive employees. The work of the lack of first to strive for excellence and fighting spirit of innovation, study and study the theoretical knowledge and professional knowledge is not a certain height.
3, lack of awareness of innovation, the lack of bright spots.
4, open-minded enough, failing to easily impatient, lack of control
Fourth, the corrective measures:
1, to strengthen theoretical study, and constantly improve their political quality. Consciously strengthen the exercise to the idea of self-discipline armed with their own minds, to those dedicated, positive, innovative colleagues to learn, work more brains.
2, in order to be a high sense of responsibility, dedication, hard work, solid, the courage to advance the work to complete the task, in the process of regional management of the workshop team to a higher level.
3, establish team team spirit. As a team leader, I want to always keep a clear head, keep up with the pulse of the times, give full play to the subjective initiative. To consciously strengthen the exercise, at work, learn to sum up and observe, to improve the sense of pioneering and innovative
4, I am concerned about the labor and the new interns is not enough. In the future study, work more concerned about them, usually more chat to understand the ideological trends.
In short, as a team leader in the work to play an exemplary role, should be based on their own work, and strive to do their jobs, love and respect their jobs, fine drilling business. In the future study and work, I will continue to reflect on the continuous progress in the reflection. Humbly accept my colleagues around me to make suggestions and opinions, and strive to improve themselves, so that their continuous progress, play an exemplary role for the team to serve good, do a monitor should do the obligation, and strive to be a good team leader.
篇16:工厂班组长年度工作总结
工厂班组长年度工作总结
XX年,在领导正确带领下,无论从班组的绩效还是班组建设方面都取得了丰厚的成果,以下,在此向大家回报一下今年的工作内容以及日后的发展方向:
一、加强班组建设和管理
1、塑造班组文化建设,提升班组成员的凝聚力。充分利用例会和车间班前班后会,传达公司的第二次创业发展方向,使班组成员真正领会到公司的.发展要求、前景和目标,努力向新的方向迈进。
2、不断参加班组长培训。车间班组长的责任直接影响车间的工作绩效,因此,在XX年的班组建设中我首先强化自身的带头作用。加强班组长的培训与学习,同时为班组成员团队学习的机会,使他们真正发挥技术骨干和模范带头作用,
二、狠抓安全管理
1、充分利用周二安全例会时间,认真分析一周来的安全生产情况,将车间发生的安全事故认真分析总结,吸取经验,杜绝类似事故的再次发生。
2、加强了对班组安全检查力度,完善了岗位责任制,发现问题及时通报并限期整改,使安全隐患大大降低,确保了XX年的安全生产。
三、生产、技术管理得到加强。积极配合质量管理部门对车间质量的检查力度,并强化生产技术的管理力度,使产品质量一次抽检合格率大大提高,水分超标现象减少,产品板结现象得到较好控制。
四、现场管理得到改善。
1、制定了现场管理制度,并在生产过程中认真执行,
篇17:工厂员工自我评价
在本部门工作中,我一直严格要求自己,认真及时地完成领导布置的每一项任务,并虚心向同事学习,不断改正工作中的不足;对于集团及公司的制度和规定都是认真学习并严格贯彻执行;另外,本人具有很强的团队合作精神,能很好的协调及沟通,配合各部门负责人落实及完成公司各项工作,并热心帮助其他同事,与人相处和-谐融洽。
在过去的2个月中,通过不断的学习和自我提高,已经适应了自己的本职工作,但是对于一个初入公司的新人,要全面融入企业的方方面面,可能在一些问题的考虑上还不够全面,但是我相信,通过公司领导及同事的悉心指导和帮助,我一定能在今后的工作中更好的提高自己的业务水平和综合素质,更好的完成本职工作,不断谋求与企业的共同发展!员工转正自我评价500字范文二:
我叫XXX,于XXX年XX月XX日进入公司,根据公司的需要,目前在XX工作。本人工作认真、细心且具有较强的责任心和进取心,工作热情,性格开朗,乐于与他人沟通,具有良好的沟通技巧,有很强的团队协作能力;责任感强,按时完成领导交付的工作,和公司同事之间能够通力合作,关系相处融洽而和睦,配合各部门负责人成功地完成各项工作;积极学习新知识、技能,注重自身发展和进步。
XX是一个工作任务非常重而且非常繁琐的部门,每天工作都是一环扣一环,每一个人都必须认认真真的上岗才能确保工作的质量,在这样的一个部门里,我学习了很多,领悟了很多:
首先,我非常敬佩领导的能力。在其他公司我也做过,领导什么都不会什么都不懂的很多,可这里不同,公司给我们培训的领导、我们部门的领导甚至我们实习时所在部门的领导的专业精神让我敬佩,和他们在一起天天都有我要学习的,好像从他们的身上上我永远都有取之不尽用之不绝的知识。其次,工作时各个部门的衔接非常到位。我们在华为实习的时候,对那里的工作很不熟悉,打印、复印都不知道要找谁。是资讯的同事帮助我们,主动给我们打印需要的材料,帮助我们复印课业,真的体现了华为是一个大家庭,我们都是其中一员这样的精神,真的非常感谢他们。
在本部门的工作中,我勤奋工作,获得了本部门领导和同事的认同。当然,在工作中我也有不足之处部门领导也及时给我指出,促进了我工作的成熟性。
如果说刚来的那几天仅仅是从员工的口中了解公司,对公司的认识仅仅是皮毛的话,那么随着时间的推移,我对公司也有了更为深刻的了解。公司宽松融洽的工作氛围、团结向上的企业文化,让我很快进入到了工作角色中来。这就好比一辆正在进行磨合的新车一样,一个好的司机会让新车的磨合期缩短,并且会很好的保护好新车,让它发挥出最好的性能。咱们公司就是一名优秀的司机,新员工就是需要渡过磨合期的新车,在公司的领导下,我会更加严格要求自己,在做
好本职工作的同时,积极团结同事,搞好大家之间的关系。在工作中,要不断的学习与积累,不断的提出问题,解决问题,不断完善自我,使工作能够更快、更好的完成。我相信我一定会做好工作,成为华为的一份子,不辜负领导对我的期望。
总之,在这两个月的工作中,我深深体会到有一个和谐、共进的团队是非常重要的,有一个积极向上、大气磅礴的公司和领导是员工前进的动力。华为公司给了我这样一个发挥的舞台,我就要珍惜这次机会,以华为为家、顾客至上、合作奋斗的口号来严格要求自己,为公司的发展竭尽全力。在此我提出转正申请,希望自己能成为公司的正式员工,恳请领导予以批准。
篇18:工厂员工自我评价
最近在工厂我的工作主要为做网上广告宣传,发布产品信息;以及寻找门窗工厂和工程单位!对工厂和工程单位进行发送我厂的产品信息邮件和工厂服务宗旨,工厂员工工作汇报范文。因为个人无法写有关于门窗安装和产品的文章,也在网络上寻找文章备战!
出差大沥工作主要为与门市交谈产品和最近市场情况!大沥处于淡季多数门市无客户来往和交易电话响,员工多在聊天!对我厂的产品的反应是产品厚薄不统一;和厚度不达标!最有潜力的客户(永业、信坚、天龙)永业给我发过信息和打过电话,我相信可以把他拿下!
上面是简单的工作报告和出差报告!下面也谈一下管理和我的工作评价。
当然炬诚五金生存和发展到今天可以说是老板的'有目光、胆量和业务能力。三个重要的条件是成功不可缺少的!而今天我来说说,只不过是厚颜献丑:
像今天的炬诚五金不能说生产力跟不上;有着40台的压机,10多名的操作工。此规模属于大规模,因为我们的产品单一、专业。按理说,厂房已有空间并每一岗位不缺人手。失败在于没有备货的和理安排和工作的合理安排交接。每一天的工作的完成度和交接登记没有做。其实卡位的固定片可以先做当90#系列先备货。沟通协调工作得多花时间、精力、诚心与尊重!像我到大沥后公司在大沥的成功没有我的功劳也应有点苦劳,因为我是拓荒牛,是对我的尊重,工作汇报《工厂员工工作汇报范文》。车间确实需要个主管,这个主管应该是摸具师傅,还得有管理工作安排的经验和爱岗爱员工的精神。有句话说什么样的老板会有什么样的员工,什么样的管理者会有什么样的下属。
上面为备述管理安排,再细编可整理出厂规和工作日程表。下面谈谈我的工作对老板和厂的关系:
我在老板和老板娘的双眸中看出老板对我极为不满,可能是以下原因:
一、我的业绩不佳。(我虽然有点差,但我一直在以全力以赴也因生产能力的关系对有些单谈拢有限制,所以我的自我感觉不失败;也因为用我没有亏)
二、我不会向老板套近乎。(这个我是永远学不会,我认为尊重别人不能伪善;我平生最讨厌伪君子和不道德不善良的人。曾经老板压我身份证是为了我的信用保证不是为了帮我买保险这个可以适当的效仿,可以接受。)
三、我最近的工作不报告,肯定是在玩游戏和工作不卖命。(我个人水平有限,写千篇 一律的报告我自认为不必要;当然有可能我错了,但没文水的人是很难坚持,我也很想坚持,但工作量不少;这个可能没人相信,坐在电脑前我几乎是机器一样的工作。有话说“用人不疑,疑人不用”如果我怀疑某人,我是一辈子绝对不用的。我认为如果真没有能力做事的人就善意辞退是在帮助双方,1、为为自己增加更多时间在有能力的员工身上,2、为让对方自己能找到自己的谋生之道,此为职业道德。)
四、兔死狗烹(就当讲个故事;最近我的右眼皮一直在跳,我是有点迷信,所以我得尊重道德;公司在大沥的新单我一直相信老板是知道的,究竟要怎么做我也不计较这点业绩公司给我的提成在我眼里就如鸡屎这么点;但现在做为您的员工我不能认为工资少就马上停住工作,现在只是为道德在工作,我也不在乎工资的悬殊来侮辱我。只是昨天在大沥听听店老板的谈话才觉得我在这里真的没有自由施展平台我听到看到只是假象。该我的功劳不分配是老板的错,但我一直不计较,只是今天您自己提起说我没用,业绩差,我也不得不说说心里话!至于您有没有看到我在做事,我不放在心上,也不假装;我从来认为做业务是为自己而做不是为了只拿老板的钱;就算我拿不到工资,我也不需要监督,我一样好好工作;没有业绩是做业务的人最大的羞辱,最大的失败。)
我没有做过老板也无法给您写老板的管理经验。我只是个员工,也没有资格向老板谈。在业务分配和管理的缺点上也是我进厂来没有考虑到的,只是说您有一个跟单,我才是业务员,无法料到会有如此的结果。至于明天您怎么安排我的工作日程和工作安排明天再说。感谢您带我进红了五千年的五金行业。我是有点看到这个行业的前景与将来的发展。
篇19:工厂员工自我评价简短
理论学习方面:本人积极参加党支部的组织生活,在思想上、政治上、行动上和党中央保持高度一致,坚定共产主义信念;认真学习党的xx届六中全会的精神、“xxxx”精神、方永刚同志先进事迹等理论知识。
同时,作为一名工程技术人员,本人还认真学习与工作相关的网络、视频等相关知识,积极参加公司组织的各类业务培训,不断提高业务能力和工作能力。工作方面:一是本人积极向领导前辈们学习他们好的经验,好的方法,通过一步一步学习、一点一滴积累,进一步提高自身的业务知识能力水平;二是通过主动请缨出差,在实践中锻炼自身协调能力和工作能力,在带队施工过程中,发现存在问题,积极向领导们请教,加以改进。存在的不足:一年来,本人在思想、工作等方面都有一定程度的提高,但与优秀党员的标准、与党和人民的要求还存在一定差距,今后我将更加努力、勤奋工作,不断提高自己的党性修养,不断增强为人民服务的本领,积极向优秀党员的标准靠拢。
篇20:工厂新员工自我评价
我的理念是:在年轻的季节我甘愿吃苦受累,只愿通过自己富有激情、积极主动的努力实现自身价值并在中做出最大的贡献。
作为初学者,我具备出色的学习能力并且乐于学习、敢于创新,不断追求卓越;作为参与者,我具备诚实可信的品格、富有团队合作精神;作为领导者,我具备做事干练、果断的风格,良好的沟通和协调能力。受过系统的经济相关专业知识训练,有在多家单位和公司的和兼职;有很强的忍耐力、意志力和吃苦耐劳的品质,对工作认真负责,积极进取,个性乐观执着,敢于面对困难与挑战。
★ 带班英文自我评价
工厂班组长英文自我评价(精选20篇)




